The first two of 12 massive beer fermentation tanks being delivered to Rochester’s Genesee Brewery were off-loaded at the St. Paul Street facility on Saturday.
The fermentation tanks built in China arrived this week via barges on the Erie Canal. They started their 225-mile trip two weeks ago at the waterway's terminus near Albany.
The tanks are 20 feet wide and 60 feet tall, making them too big to be hauled long distances by truck or rail.
The tanks are part of a $40 million modernization project.